CROWN & BRIDGE Digital Dental Design

Cutback Bridge 4+ Units

Extended span cutback bridge design (4 or more units) for layered porcelain. Flat-rate set pricing.


Detail

Cutback Bridge 4+ Units

A long-span bridge with cutback for ceramic veneering, covering four or more units. Designed for structural integrity across the span with consistent facial reduction allowing the ceramic technician to layer uniformly. Priced per unit.

What You Receive

  • Long-span cutback bridge STL
  • Span-appropriate connector sizing
  • Consistent facial reduction for even ceramic build-up

Required Files

Prepared arch scan + opposing scan + bite registration. Specify material, number of units, and pontic positions.

Turnaround

Standard 24–48 hours from data receipt.


0
W
WDL Assistant
Online
Hi! How can I help you today?